Execution of the water treatment plant-to-dam transmission pipeline in Esfahan steel making plant in Esfahan province

PROJECT

Execution of the water treatment plant-to-dam transmission pipeline in Esfahan steel making plant in Esfahan province

CLIENT

Esfahan steel making co.

YEAR 

2008

STATUS

Completed

Project Duration

18


Project specification:

Pipe laying  in rocky areas by drilling method with hydraulic hammer and 20,000 cubic meters approximate volume  and with 13 sets of hydraulic excavator with a hammer.

Implementing about 2 km road from Ab band Dam to Chamgardan square.
Length, size and type of
pipe:


length
is about seven kilometers.
GRP pipe size 900 mm.
Steel pipe sizes 1000 and 1200 mm.