CLIENT
|
Esfahan steel making co.
|
YEAR
|
2008
|
STATUS
|
Completed
|
Project specification:
Pipe laying in rocky areas by drilling method with hydraulic hammer and 20,000 cubic meters approximate volume and with 13 sets of hydraulic excavator with a hammer.
Implementing about 2 km road from Ab band Dam to Chamgardan square.
Length, size and type of pipe:
length is about seven kilometers.
GRP pipe size 900 mm.
Steel pipe sizes 1000 and 1200 mm.